back home A2 Świecko - Konin | Every kilometer matters
Back

Construction of passageways (Poznań Krzesiny Interchange)

From Monday, 8th of July to Wednesday, 10th of July, in the area of the Poznań Krzesiny Interchange, works on the construction of passageways will be continued:

  • 170km+010 do 170km+090 (during this time, a fast lane on both sides will be closed)
  • 170km+440 do 170km+480 (during this time, the emergency lane on the main road and the left lane on the collective-distribution road will be closed)