Road resurfacing at the Poznań Komorniki junction
On 27 July 2026, Autostrada Wielkopolska SA will commence road resurfacing works at the Poznań Komorniki junction (159 km A2).…
Read more
home
A2 Świecko - Konin | Every kilometer matters
27 April from 6 am to 4 pm, the right lane on the southern road (Warsaw direction) will be closed on the 156km + 100- 156km + 700 section. Traffic will be driven only on the left lane. During this time, construction of the bridge over the Wirynka River will be carried out.