Road resurfacing at the Poznań Komorniki junction
On 27 July 2026, Autostrada Wielkopolska SA will commence road resurfacing works at the Poznań Komorniki junction (159 km A2).…
Read more
home
A2 Świecko - Konin | Every kilometer matters
From May the works related to wearing course exchange on section Poznań-Września will be continuate. Temporary traffic system will be introduced on indicated sections of motorway.
Schedule of works:
• 22.05 – 5.06 closure of northern road, southern road-lanes drive on section 202km+350 – 199km+850; closure of CSA Chwałszyce
• 4.06 – 9.06 closure of northern road, southern road-lanes drive on section 199km+850 – 196km+950. Closure of emergency exit (197km+035), northern side
• 10.06 closure of southern road, northern road-lanes drive on section 196km+950 – 202km+350. Closure of emergency exit (196km+943) and CSA Targowa Górka, southern side
Schedule presented above can change, due to weather conditions.