back home A2 Świecko - Konin | Every kilometer matters
Back

Update. Next stage of pavement renovation of A2 on section Poznań – Września

The next stage of the works related to wearing course exchange on section Poznań-Września will be continuated (171km+600-193km+950). Temporary traffic system will be introduced on indicated sections of motorway.

Schedule of works:
• 19.08 – 23.08 closure of southern road, northern road-lanes drive on section 190km+150 – 193km+950
• 19.08 closure of southern road, northern road-lanes drive on section 193km+950 – 196km+950. Road-lanes drive on emergency exit 197km+035 N and 196km+943 S
• 25.08 closure of northern road, southern road-lanes drive on section 181km+300 – 176km+050 (Rest and Service Areas available to users, possibility of entry and exit on the Poznań East interchange)

Schedule presented above can change, due to weather conditions.

Information about traffic flow from Konin to Świecko is available on: twitter.com/AutostradaWlkp and on Hotline number: 0 800 022 242