Road resurfacing at the Poznań Komorniki junction
On 27 July 2026, Autostrada Wielkopolska SA will commence road resurfacing works at the Poznań Komorniki junction (159 km A2).…
Read more
home
A2 Świecko - Konin | Every kilometer matters
The next stage of the works related to wearing course exchange on section Poznań-Września will be continuated (171km+600-193km+950). Works will end on 30.10.2018.
• 30.10 the end of the works related to wearing course exchange on section Poznań – Września
• 30.10 closure of slow lane, fast lane drive on Bridge MA 16km, 173km+778 (Warsaw direction). The interruption till 5.11
• 5.11 closure of slow lane, fast lane drive on Bridge MA 16km, 173km+778 (Warsaw direction)
• 6,7.11 closure of fast lane, slow lane drive on Bridge MA 16km, 173km+778 (Warsaw direction)
Schedule presented above can change, due to weather conditions.
Information about traffic flow from Konin to Świecko is available on: twitter.com/AutostradaWlkp and on Hotline number: 0 800 022 242