Road resurfacing at the Poznań Komorniki junction
On 27 July 2026, Autostrada Wielkopolska SA will commence road resurfacing works at the Poznań Komorniki junction (159 km A2).…
Read more
home
A2 Świecko - Konin | Every kilometer matters
On 24/25th of July begin works within Sługocin Interchange (244km of motorway), section Września-Konin. There will be temporal traffic system. With the closure of works within A2 motorway, works will be organized on slip road C (passage from Poznań to Interchange) and slip road D (exit from the Interchange to Warszawa).
The renovation will last till about 5-7 days. Schemes of works can change depending on the weather conditions and current traffic intensity within the Interchange.
Works are conducted within Sługocin Interchange. The executor of the works is Strabag LLC (person to contact with: Marcin Szczepański, tel. +48 695 020 857).
The temporal traffic system was agreed with General Directorate for National Roads and Motorways in Poznań, Autostrada Wielkopolska Inc, Autostrada Eksploatacja Inc and appropriate Police units.
Information about passage condition from Konin to Świecko are available on: twitter.com/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00a.m. and 8.00 p.m.)