Road resurfacing at the Poznań Komorniki junction
On 27 July 2026, Autostrada Wielkopolska SA will commence road resurfacing works at the Poznań Komorniki junction (159 km A2).…
Read more
home
A2 Świecko - Konin | Every kilometer matters
The works will consist, without limitation, in upgrading the lighting of the canopy, and the replacement of the luminaires with more ecological LED ones.
In order to minimize the nuisance caused by the rehabilitation to drivers, the works were divided into stages in such a way as to exclude from use a maximum of two out of 14 available lanes at a time. During the rehabilitation there may also be difficulties in the movement of oversize vehicles, yet they will be able to pass.
Autostrada Wielkopolska obliged the contractor to deliver the works as scheduled. However, please note that difficult weather conditions such as strong will or rainfall may delay the works.