Road resurfacing at the Poznań Komorniki junction
On 27 July 2026, Autostrada Wielkopolska SA will commence road resurfacing works at the Poznań Komorniki junction (159 km A2).…
Read more
home
A2 Świecko - Konin | Every kilometer matters
From 4 April there will be a continuation of pavement renovation of main road A2 motorway, section Września-Konin. There will be temporal traffic system on pointed sections of motorway.
Schedule of works:
o STAGE A: 16.04.2018 closure of fast lane on access road and 2 left transfer lanes on northern road (direction Świecko) of Lądek Toll Plaza (PPO Lądek)
o STAGE B: 18.04.2018 closure of slow lane on access road and 2 right transfer lanes on northern road (direction Świecko) of Lądek Toll Plaza (PPO Lądek); closure of CSA Lądek
o STAGE C: 20.04.2018 closure of middle transfer lanes on northern road (direction Świecko) of Lądek Toll Plaza (PPO Lądek)
o 22.04-27.04.2018 works on southern road (direction Warszawa)
Schedules presented above can change, due to weather conditions and current traffic intensity within section of works.
Works will be conducted according to heavy maintenance plan, that assumes (same as in case of public motorways) pavement renovation after 10 years of using. Works will last till October 2017. The executor of the works is Strabag LLC (person to contact with: Marcin Szczepański, tel. +48 695 020 857).
The temporal traffic system was agreed with Provincial Police Headquarters in Poznań, General Directorate for National Roads and Motorways, Autostrada Wielkopolska Inc. and Autostrada Eksploatacja Inc.
Information about passage condition from Konin to Świecko are available on: twitter.com/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00a.m. and 8.00 p.m.)