{"id":6133,"date":"2024-03-28T10:42:24","date_gmt":"2024-03-28T10:42:24","guid":{"rendered":"http:\/\/a2.codocaine.com\/uncategorized\/pavement-rehabilitation-at-the-jordanowo-interchange-a2-km-68710-3\/"},"modified":"2024-06-23T21:13:42","modified_gmt":"2024-06-23T21:13:42","slug":"pavement-rehabilitation-at-the-jordanowo-interchange-a2-km-68710-3","status":"publish","type":"post","link":"https:\/\/a2.codocaine.com\/en\/news\/pavement-rehabilitation-at-the-jordanowo-interchange-a2-km-68710-3\/","title":{"rendered":"Pavement rehabilitation at the Jordanowo Interchange (A2 km 68+710)"},"content":{"rendered":"<h4>3 April is the scheduled commencement date for Phase 2 of the pavement rehabilitation at the Jordanowo Interchange (A2 km 68+710). The works will result in scheduled detours. Drivers are requested to be alert and to abide by the temporary traffic organization signs.<\/h4>\n<p>In line with its long-term maintenance program, Autostrada Wielkopolska II continues rehabilitation works at the Jordanowo Interchange (A2 km 68+710) commenced last year. In order to minimize the construction&#8217;s impact on drivers, the works have been phased.<\/p>\n<p>Rehabilitation works one will begin on 3 April and will include rehabilitation of the pavement structure on the entry slip roads of the interchange. Therefore, drivers traveling on the A2 motorway and willing to enter the A2 from the S3 expressway will have to use the prepared detours.<\/p>\n<ul>\n<li>For drivers of vehicles with gross vehicle weight below 7 tons ( GVW&lt; 7 t) intending to enter the A2 towards Warsaw a detour will be prepared using county roads leading to national road (DK92) to Trzciel and further on the provincial road 137 to the Trzciel Interchange, where they will be able to enter the motorway towards Warsaw.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-5307\" src=\"http:\/\/a2.codocaine.com\/wp-content\/uploads\/2024\/06\/AWSA_mapki_objazdy_1200x900_jordanowo_wjazd-kier-W-wa-ponizej-7.5t-3-300x225.png\" alt=\"AWSA mapki objazdy 1200x900 jordanowo wjazd kier W wa ponizej 7.5t 3 300x225\" width=\"476\" height=\"357\" \/><\/p>\n<ul>\n<li>For drivers of vehicles with gross vehicle weight exceeding 7 tons ( GVW&gt; 7 t) intending to enter the A2 towards Warsaw a detour will be prepared using the Nowy Tomy\u015bl Interchange, i.e., from the S3 expressway onto the national road 92 direction Nowy Tomy\u015bl and further on the provincial road 305 to the Nowy Tomy\u015bl interchange.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-5309\" src=\"http:\/\/a2.codocaine.com\/wp-content\/uploads\/2024\/06\/AWSA_mapki_objazdy_1200x900_jordanowo-wjazd-kier-W-wa-dmc-pow-7.5t-3-300x225.png\" alt=\"AWSA mapki objazdy 1200x900 jordanowo wjazd kier W wa dmc pow 7.5t 3 300x225\" width=\"491\" height=\"368\" \/><\/p>\n<ul>\n<li>Drivers intending to enter the A2 motorway towards \u015awiecko will be requested to use a detour to the Torzym interchange, i.e., on the national road 92 direction Torzym and further on the provincial road 138 to the Torzym Interchange where they will be able to continue on the motorway toward \u015awiecko.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-5311\" src=\"http:\/\/a2.codocaine.com\/wp-content\/uploads\/2024\/06\/AWSA_mapki_objazdy_1200x900_jordanowo-wjazd-kier-Swiecko-5-300x225.png\" alt=\"AWSA mapki objazdy 1200x900 jordanowo wjazd kier Swiecko 5 300x225\" width=\"511\" height=\"383\" \/><\/p>\n<p>The works on entry slip roads are estimated to take ca. three weeks, until 25 April. Autostrada Wielkopolska II obligated the contractor to timely complete the works. It must, however, be remembered that inclement weather (high wind, rainfall) may affect the completion date.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>3 April is the scheduled commencement date for Phase 2 of the pavement rehabilitation at the Jordanowo Interchange (A2 km 68+710). The works will result in scheduled detours. Drivers are requested to be alert and to abide by the temporary traffic organization signs. In line with its long-term maintenance program, Autostrada Wielkopolska II continues rehabilitation [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6134,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[28,29],"tags":[],"class_list":["post-6133","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/6133","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/comments?post=6133"}],"version-history":[{"count":1,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/6133\/revisions"}],"predecessor-version":[{"id":6137,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/6133\/revisions\/6137"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media\/6134"}],"wp:attachment":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media?parent=6133"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/categories?post=6133"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/tags?post=6133"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}