{"id":4446,"date":"2023-06-12T05:55:59","date_gmt":"2023-06-12T05:55:59","guid":{"rendered":"http:\/\/a2.codocaine.com\/?p=4446"},"modified":"2023-06-12T05:55:59","modified_gmt":"2023-06-12T05:55:59","slug":"rehabilitation-of-the-pavement-in-a2-sections-between-poznan-and-nowy-tomysl","status":"publish","type":"post","link":"https:\/\/a2.codocaine.com\/en\/news\/rehabilitation-of-the-pavement-in-a2-sections-between-poznan-and-nowy-tomysl\/","title":{"rendered":"Rehabilitation of the pavement in A2 sections between Pozna\u0144 and Nowy Tomy\u015bl"},"content":{"rendered":"<h4>Rehabilitation works on the pavement in the motorway mainline in the vicinity of the Pozna\u0144 Zach\u00f3d and Buk interchanges have been progressing as planned. From 9 June works start on the next section, between km 144 and km 140 of the northbound lanes (in the \u015awiecko direction). Due to the works traffic will be transferred to the southbound lanes of the motorway.<\/h4>\n<p>At the same time, works will also commence on the section between km 111 and km 115 of the A2 in the Warsaw direction (southbound lanes). In this case, vehicle traffic will be transferred to the northbound lanes. Due to the works the entrance to Kozielaski Rest and Service Area (MOP) (approx. 114 km of A2, in the Warsaw direction) will be closed.<\/p>\n<p>The performance of the works has been planned in such a way as to be efficient and least burdensome for drivers. However, please take into account that weather conditions, strong wind, rainfall, etc. may affect the time of completion of works.<\/p>\n<p>The upgrading works of the bituminous pavement between Nowy Tomy\u015bl and Pozna\u0144 form part of a long-term maintenance plan taken up by Autostrada Wielkopolska in due care to ensure high road quality and travel comfort and safety for drivers. The concession section is largely used by heavy transport which naturally causes increased wear of the road pavement and consequently rehabilitation is required.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rehabilitation works on the pavement in the motorway mainline in the vicinity of the Pozna\u0144 Zach\u00f3d and Buk interchanges have been progressing as planned. From 9 June works start on the next section, between km 144 and km 140 of the northbound lanes (in the \u015awiecko direction). Due to the works traffic will be transferred [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":4444,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[28,29],"tags":[],"class_list":["post-4446","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/4446","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/comments?post=4446"}],"version-history":[{"count":1,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/4446\/revisions"}],"predecessor-version":[{"id":4447,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/4446\/revisions\/4447"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media\/4444"}],"wp:attachment":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media?parent=4446"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/categories?post=4446"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/tags?post=4446"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}