{"id":3433,"date":"2022-05-20T13:57:00","date_gmt":"2022-05-20T13:57:00","guid":{"rendered":"https:\/\/test2.autostrada-a2.pl\/uncategorized\/press-relase-262-2\/"},"modified":"2022-10-24T09:13:13","modified_gmt":"2022-10-24T09:13:13","slug":"press-relase-262-2","status":"publish","type":"post","link":"https:\/\/a2.codocaine.com\/en\/press-relases\/press-relase-262-2\/","title":{"rendered":"Renovation of the surface at the S\u0142upca junction and the L\u0105dek MOP"},"content":{"rendered":"<p>_x000D_<br \/>\n<strong>The company Autostrada Wielkopolska is commencing works related to the renovation of the pavement at the S\u0142upca motorway junction (km 229 + 173 A2 motorway) and MOP L\u0105dek (km 237 A2 motorway, direction Warsaw). The works are planned to start on May 23 this year. We ask the drivers to pay attention and compliance with the signs of temporary traffic organization.<\/strong><\/p>\n<p>_x000D_<br \/>\n_x000D_<\/p>\n<p>In connection with the works at the S\u0142upca junction, a shuttle traffic will be introduced at the roundabout connecting the road No. 466 with the A2 motorway exit junctions and the access road to SPO S\u0142upca towards Pozna\u0144. Due to the renovation of the pavement at the L\u0105dek MOP, the MOP will be temporarily excluded from use. Entry to MOP L\u0105dek will be closed on Monday 23.05. in the early morning hours.<br \/>_x000D_<br \/>\nThe duration of renovation works in both locations is planned for approx. 3 days, however, it depends on the weather conditions. Unfavorable weather, such as rainfall, may delay their start or end dates. The Company and the Contractor make every effort to ensure that the works run smoothly and are as least burdensome as possible for drivers.<\/p>\n<p>_x000D_<br \/>\n_x000D_<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>_x000D_ The company Autostrada Wielkopolska is commencing works related to the renovation of the pavement at the S\u0142upca motorway junction (km 229 + 173 A2 motorway) and MOP L\u0105dek (km 237 A2 motorway, direction Warsaw). The works are planned to start on May 23 this year. We ask the drivers to pay attention and compliance [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[29],"tags":[],"class_list":["post-3433","post","type-post","status-publish","format-standard","hentry","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/3433","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/comments?post=3433"}],"version-history":[{"count":1,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/3433\/revisions"}],"predecessor-version":[{"id":3764,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/3433\/revisions\/3764"}],"wp:attachment":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media?parent=3433"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/categories?post=3433"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/tags?post=3433"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}