{"id":2765,"date":"2022-07-21T13:42:22","date_gmt":"2022-07-21T13:42:22","guid":{"rendered":"https:\/\/test2.autostrada-a2.pl\/uncategorized\/press-relase-205\/"},"modified":"2022-10-24T09:26:06","modified_gmt":"2022-10-24T09:26:06","slug":"press-relase-205","status":"publish","type":"post","link":"https:\/\/a2.codocaine.com\/en\/news\/press-relase-205\/","title":{"rendered":"New Temporary Traffic Management between Pozna\u0144 Zach\u00f3d \u2013 Pozna\u0144 Komorniki interchanges from 29 July"},"content":{"rendered":"<p><strong>The works are underway on the construction of the third traffic lane in the north carriageway of the Bypass between Pozna\u0144 Zach\u00f3d \u2013 Pozna\u0144 Komorniki interchanges (155km+870 &#8211; 158km+700). The new Temporary Traffic Management will come into effect as of Monday 29 July. At the same time works are being performed between Pozna\u0144 Lubo\u0144 and Pozna\u0144 Krzesiny interchanges.<\/strong><\/p>\n<p>New Temporary Traffic Management between Pozna\u0144 Zach\u00f3d and Pozna\u0144 Komorniki interchanges will be implemented from Saturday 27<sup>th<\/sup> July until Sunday 28<sup>th<\/sup> July. As of Monday 29<sup>th<\/sup> July drivers will have 4 traffic lanes available in the southern carriageway of that section: two in the Warsaw direction and two in the \u015awiecko direction, without emergency lane in both directions. At the same time completion works will be carried out on the entire width of the north carriageway to extend the Bypass by building the third lane and replacing the existing pavement.<\/p>\n<p>&#8211;<em>\u201cThe works on the Pozna\u0144 Bypass have been smoothly progressing, and traffic management has frequently changed recently. Therefore we ask drivers, especially those using the Bypass every day, not to drive automatically. Particular attention should be paid both to signage, and to marking. \u201cIf drivers follow traffic signs and limit their speed to 70 km\/h, the trip in that section will surely be safe and calm\u201d \u2013 says Micha\u0142 Pabich, project manager of Autostrada Wielkopolska.<\/em><\/p>\n<p>The Temporary Traffic Management between Pozna\u0144 Zach\u00f3d \u2013 Pozna\u0144 Komorniki interchanges in force as of 29 July<\/p>\n<p><img decoding=\"async\" alt=\"d3d0a245b3c5bf890d7f3acac837036c8e5a1c7e\" src=\"\/upload\/media\/default\/0001\/02\/d3d0a245b3c5bf890d7f3acac837036c8e5a1c7e.png\" style=\"height:585px; width:900px\" \/><\/p>\n<p>At the same time works are being performed between Pozna\u0144 Lubo\u0144 and Pozna\u0144 Krzesiny interchanges. Drivers in the southern carriageway (carrying traffic from \u015awiecko in the direction of Warsaw) will use the emergency lane. On the northern carriageway (in the direction of \u015awiecko) three traffic lanes are available (without the emergency lane): two in the \u015awiecko direction and one in the Warsaw direction. Drivers driving that lane towards the capital do not have the possibility of exiting the motorway in the Pozna\u0144 Krzesiny interchange. That lane is recommended for all vehicles, including heavy vehicles making a transit trip in the direction of Warsaw.<\/p>\n<p>Since 22 July drivers have used the Pozna\u0144 Lubo\u0144 &#8211; Pozna\u0144 Krzesiny section according to the diagram below:<\/p>\n<p><img decoding=\"async\" alt=\"4db773cfbb07fde16a4cc46e8d6ffb523af9bb99\" src=\"\/upload\/media\/default\/0001\/02\/4db773cfbb07fde16a4cc46e8d6ffb523af9bb99.png\" style=\"height:519px; width:900px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The works are underway on the construction of the third traffic lane in the north carriageway of the Bypass between Pozna\u0144 Zach\u00f3d \u2013 Pozna\u0144 Komorniki interchanges (155km+870 &#8211; 158km+700). The new Temporary Traffic Management will come into effect as of Monday 29 July. At the same time works are being performed between Pozna\u0144 Lubo\u0144 and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":370,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[28,29],"tags":[],"class_list":["post-2765","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2765","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/comments?post=2765"}],"version-history":[{"count":1,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2765\/revisions"}],"predecessor-version":[{"id":2766,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2765\/revisions\/2766"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media\/370"}],"wp:attachment":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media?parent=2765"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/categories?post=2765"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/tags?post=2765"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}