{"id":2751,"date":"2022-07-21T13:42:19","date_gmt":"2022-07-21T13:42:19","guid":{"rendered":"https:\/\/test2.autostrada-a2.pl\/uncategorized\/press-relase-194\/"},"modified":"2022-10-24T09:26:08","modified_gmt":"2022-10-24T09:26:08","slug":"press-relase-194","status":"publish","type":"post","link":"https:\/\/a2.codocaine.com\/en\/news\/press-relase-194\/","title":{"rendered":"Road paving"},"content":{"rendered":"<p><strong>In the section between Pozna\u0144 Komorniki and Pozna\u0144 Lubo\u0144 interchanges, bituminous layer<\/strong> <strong>on the new, third traffic lane of the Pozna\u0144 motoway Bypass is being finalised. New noise barriers will be installed<\/strong> <strong>before Easter.<\/strong><\/p>\n<p>The extension works go ahaed in compliance with the plan. More than 200 people work on the building site every day.\u00a0<\/p>\n<p><em>Thanks to appropriate work organisation, the first effects of the extension of the Pozna\u0144 motorway Bypass can be already seen by drivers and citizens of Pozna\u0144 \u2013 says Zofia Kwiatkowska, Press Officer of Autostrada Wielkopolska S.A.. \u2013 By the end of this week the new bituminous layer will be put on the new, third traffic lane. Banks are being made on the second traffic lane in paralell,\u00a0 which allows us to continue our works smoothly \u2013 ensures.\u00a0<\/em><\/p>\n<p>A2 Motorway is the main internal transport channel connecting eastern and western part of Poland. About 65 thousand vehicles drive in the bypass daily, meaning that almost 23 million drivers use the bypass during the year. The extension of the Pozna\u0144 motorway Bypass is the first project of such complexity ever implemented in the motorway \u201cunder traffic\u201d in Poland. The total investment cost amounts to PLN 200 mln and is fully covered by the investor, Autostrada Wielkopolska S.A..<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the section between Pozna\u0144 Komorniki and Pozna\u0144 Lubo\u0144 interchanges, bituminous layer on the new, third traffic lane of the Pozna\u0144 motoway Bypass is being finalised. New noise barriers will be installed before Easter. The extension works go ahaed in compliance with the plan. More than 200 people work on the building site every day.\u00a0 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":370,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[28,29],"tags":[],"class_list":["post-2751","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2751","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/comments?post=2751"}],"version-history":[{"count":1,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2751\/revisions"}],"predecessor-version":[{"id":3792,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2751\/revisions\/3792"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media\/370"}],"wp:attachment":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media?parent=2751"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/categories?post=2751"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/tags?post=2751"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}