{"id":2711,"date":"2022-07-21T13:42:12","date_gmt":"2022-07-21T13:42:12","guid":{"rendered":"https:\/\/test2.autostrada-a2.pl\/uncategorized\/press-relase-162\/"},"modified":"2022-10-24T09:26:16","modified_gmt":"2022-10-24T09:26:16","slug":"press-relase-162","status":"publish","type":"post","link":"https:\/\/a2.codocaine.com\/en\/news\/press-relase-162\/","title":{"rendered":"Update. Next stage of pavement renovation of A2 on section Pozna\u0144 &#8211; Wrze\u015bnia"},"content":{"rendered":"<div>\n<p>The next stage of the works related to wearing course exchange on section Pozna\u0144-Wrze\u015bnia will be continuated (171km+600-193km+950). Temporary traffic system will be introduced on indicated sections of motorway.<\/p>\n<p>Schedule of works:<br \/>\u2022 27.06 closure of northern road, southern road-lanes drive on section 190km+150- 193km+950. Estimated time of work: 10-12 working days<br \/>\u2022 4.07 section 193km+950 \u2013 196km+950 of northern road reintroduced for passage<br \/>\u2022 4.07 closure of northern road, southern road-lanes drive on section 186km+900 \u2013 190km+150. Closure of emergency exit (186km+895). Estimated time of work: 10-12 working days<br \/>\u2022 6\/7.07 section 190km+150 \u2013 193km+950 of northern road reintroduced for passage<br \/>\u2022 8-10.07 closure of northern road, southern road-lanes drive on section 181km+950 \u2013 186km+900. Closure of emergency exit (186km+895). Estimated time of work: 10-12 working days<\/p>\n<p>Schedule presented above can change, due to weather conditions.<\/p>\n<p>Information about traffic flow from Konin to \u015awiecko is available on: twitter.com\/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00 a.m. and 8.00 p.m.)<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The next stage of the works related to wearing course exchange on section Pozna\u0144-Wrze\u015bnia will be continuated (171km+600-193km+950). Temporary traffic system will be introduced on indicated sections of motorway. Schedule of works:\u2022 27.06 closure of northern road, southern road-lanes drive on section 190km+150- 193km+950. Estimated time of work: 10-12 working days\u2022 4.07 section 193km+950 \u2013 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":370,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[28,29],"tags":[],"class_list":["post-2711","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2711","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/comments?post=2711"}],"version-history":[{"count":1,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2711\/revisions"}],"predecessor-version":[{"id":3820,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2711\/revisions\/3820"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media\/370"}],"wp:attachment":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media?parent=2711"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/categories?post=2711"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/tags?post=2711"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}