{"id":2674,"date":"2022-07-21T13:42:07","date_gmt":"2022-07-21T13:42:07","guid":{"rendered":"https:\/\/test2.autostrada-a2.pl\/uncategorized\/press-relase-134\/"},"modified":"2022-10-24T09:13:56","modified_gmt":"2022-10-24T09:13:56","slug":"press-relase-134","status":"publish","type":"post","link":"https:\/\/a2.codocaine.com\/en\/news\/press-relase-134\/","title":{"rendered":"Renovation works on trunk road DK2, DK29 and slip roads on \u015awiecko Interchange"},"content":{"rendered":"<div>\n<p>On Thursday, 17th of August begun another stage of renovation works within \u015awiecko Interchange (3km of motorway). Works will be organized on trunk road DK29, DK2 and slip roads C, C1, D, D1, E of \u015awiecko Interchange. The renovation of mentioned objects will last till 28th of August. <\/p>\n<p><strong>Scheduled working schemes:<\/strong><\/p>\n<ul>\n<li>17.08-31.08 Continuation of works on DK29 and slip roads C, C1, D, D1, E &#8211; works connected to reconstruction of horizontal marking, roadside cambering, regulation of gutters and resilient bars on slip roads.<\/li>\n<li>17.08-20.08 works on right roadway of DK2 (direction Warszawa) &#8211; renovation of emergency and half of right lane, section 2+900km &#8211; 3+375km \u2014 STAGE 1<\/li>\n<li>20.08-23.08 works on right roadway of DK2 (direction Warszawa) &#8211; renovation of left and half of right lane, section 2+900km &#8211; 3+375km \u2014 STAGE 2<\/li>\n<li>23.08-28.08 works on left roadway of DK2 (direction \u015awiecko) &#8211; partial renovation of left lane, section 3+375km &#8211; 2+046km \u2014 STAGE 3<\/li>\n<li>23.08-31.08 works on left roadway of DK2 (direction \u015awiecko) &#8211; renovation of left and half of right lane, section 2+800km &#8211; 3+375km \u2014 STAGE 4<\/li>\n<\/ul>\n<p>Schemes of works can be changed depending on the weather conditions and current traffic intensity within the Interchange.<\/p>\n<p>Works are conducted within \u015awiecko Interchange. The executor of the works is Strabag LLC (person to contact with: Marcin Szczepa\u0144ski, tel. +48 695 020 857).<\/p>\n<p>The temporal traffic system was agreed with Provincial Police Headquarters in Gorz\u00f3w Wlkp., General Directorate for National Roads and Motorways in Zielona G\u00f3ra, Autostrad\u0105 Wielkopolsk\u0105 Inc, Autostrad\u0105 Eksploatacja Inc, National Road District in S\u0142ubice. German side was informed about renovation of \u015awiecko Interchange by executor of works.<\/p>\n<p>Information about passage condition from Konin to \u015awiecko are available on: twitter.com\/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00a.m. and 8.00 p.m.)<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>On Thursday, 17th of August begun another stage of renovation works within \u015awiecko Interchange (3km of motorway). Works will be organized on trunk road DK29, DK2 and slip roads C, C1, D, D1, E of \u015awiecko Interchange. The renovation of mentioned objects will last till 28th of August. Scheduled working schemes: 17.08-31.08 Continuation of works [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":370,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[28,29],"tags":[],"class_list":["post-2674","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2674","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/comments?post=2674"}],"version-history":[{"count":1,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2674\/revisions"}],"predecessor-version":[{"id":2675,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2674\/revisions\/2675"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media\/370"}],"wp:attachment":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media?parent=2674"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/categories?post=2674"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/tags?post=2674"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}