{"id":2658,"date":"2022-07-21T13:42:03","date_gmt":"2022-07-21T13:42:03","guid":{"rendered":"https:\/\/test2.autostrada-a2.pl\/uncategorized\/press-relase-123\/"},"modified":"2022-10-24T09:26:16","modified_gmt":"2022-10-24T09:26:16","slug":"press-relase-123","status":"publish","type":"post","link":"https:\/\/a2.codocaine.com\/en\/news\/press-relase-123\/","title":{"rendered":"Renovation works on trunk road DK29, DK2 and slip roads on \u015awiecko Interchange"},"content":{"rendered":"<div>\n<p>On Monday, 3rd of July begins another stage of renovation works within \u015awiecko Interchange (3km of motorway). Works will be organized on trunk road DK29, DK2 and slip roads C, C1, D, D1 of \u015awiecko Interchange. The renovation of mentioned objects will last till 17th of July. <\/p>\n<p>Schemes of works will be changed depending on the weather conditions and current traffic intensity within the Interchange. There will be temporal traffic system.<\/p>\n<p>Scheduled working schemes:<\/p>\n<ul>\n<li>Continuation of works on DK29 &#8211; composition of binding layer and wearing course on road. Scheduled finalization of works &#8211; 5\/6.07.2017.<\/li>\n<li><strong>3.07\u201417.07.2017<\/strong> works connected to reconstruction of horizontal marking, roadside cambering, regulation of gutters and resilient bars on slip roads C, C1, D, D1, on trunk road DK29 and renovated sections od DK2<\/li>\n<li><strong>3\/4.07\u20147\/8.07.2017<\/strong> works on left roadway of DK2 (direction \u015awiecko) &#8211; renovation of left and half of right lane, section 2,869km-3,375km \u2014 scheme 1<\/li>\n<li><strong>7\/8.07\u201410\/11.07.2017<\/strong> works on left roadway of DK2 (direction \u015awiecko) &#8211; renovation of right lane and emergency lane, section 2,869km-3,375km \u2014 scheme 2<\/li>\n<li><strong>10\/11.07\u201414\/15.07.2017<\/strong> works on left roadway of DK2 (direction \u015awiecko) &#8211; renovation of left and half of right lane, section 2,469km-2,849km \u2014 scheme 3<\/li>\n<\/ul>\n<p>Works are conducted within \u015awiecko Interchange. The executor of the works is Strabag LLC (person to contact with: Marcin Szczepa\u0144ski, tel. +48 695 020 857). The finalization of this part of works is scheduled for the 17th of July. Dates and sequences can change.<\/p>\n<p>The temporal traffic system was agreed with Provincial Police Headquarters in Gorz\u00f3w Wlkp., General Directorate for National Roads and Motorways in Zielona G\u00f3ra, Autostrad\u0105 Wielkopolsk\u0105 Inc, Autostrad\u0105 Eksploatacja Inc, National Road District in S\u0142ubice. German side was informed about renovation of \u015awiecko Interchange by executor of works.<\/p>\n<p>Information about passage condition from Konin to \u015awiecko are available on: twitter.com\/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00a.m. and 8.00 p.m.)<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>On Monday, 3rd of July begins another stage of renovation works within \u015awiecko Interchange (3km of motorway). Works will be organized on trunk road DK29, DK2 and slip roads C, C1, D, D1 of \u015awiecko Interchange. The renovation of mentioned objects will last till 17th of July. Schemes of works will be changed depending on [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":370,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[28,29],"tags":[],"class_list":["post-2658","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2658","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/comments?post=2658"}],"version-history":[{"count":1,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2658\/revisions"}],"predecessor-version":[{"id":2659,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2658\/revisions\/2659"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media\/370"}],"wp:attachment":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media?parent=2658"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/categories?post=2658"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/tags?post=2658"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}