{"id":2628,"date":"2022-07-21T13:41:53","date_gmt":"2022-07-21T13:41:53","guid":{"rendered":"https:\/\/test2.autostrada-a2.pl\/uncategorized\/press-relase-104\/"},"modified":"2022-10-24T09:13:53","modified_gmt":"2022-10-24T09:13:53","slug":"press-relase-104","status":"publish","type":"post","link":"https:\/\/a2.codocaine.com\/en\/news\/press-relase-104\/","title":{"rendered":"Renovation works on and within \u015awiecko Interchange"},"content":{"rendered":"<div>\n<p>On the 15th of May, at 7.00 begins pavement renovation of slip roads on \u015awiecko Interchange, on the crossroad of A2 motorway with trunk road DK29. All works will be conducted in three parts.<\/p>\n<ol>\n<li>Pavement renovation of slip roads on \u015awiecko Interchange \u2013 scheduled for 15.05-8.06.2017<\/li>\n<li>Pavement renovation of trunk road DK29 \u2013 scheduled for 9.06-23.06.2017<\/li>\n<li>Pavement renovation of trunk road DK2 \u2013 scheduled for 24.06-15.08.2017<\/li>\n<\/ol>\n<p>Dates are only approximate; schedule can warry due to weather conditions.<\/p>\n<p>First part of \u015awiecko Interchange renovation, the pavement of slip roads, will be divided into eight stages. None of relations on the Interchange will be closed, just narrowed. There will be temporal traffic system:<\/p>\n<p><strong>STAGE I:<\/strong> 15-17.05.2017 \u2013 Renovation of slip road B with a passage from trunk road DK29 from Zielona G\u00f3ra to A2 in direction of Pozna\u0144 and slip road E with a passage from trunk road DK29 from S\u0142ubice to A2 in direction of Pozna\u0144 \u2013 milling and roads amendment, works on slip roads conducted separately.<\/p>\n<p><strong>STAGE II:<\/strong> 17-18.052017 \u2013 Renovation of slip road E with a passage from trunk road DK29 from S\u0142ubice to A2 in direction of Pozna\u0144 \u2013 pavement layering.<\/p>\n<p><strong>STAGE III:<\/strong> 19-21.05.2017 \u2013 Renovation of slip road B with a passage from trunk road DK29 from Zielona G\u00f3ra to A2 in direction of Pozna\u0144 \u2013 pavement layering.<\/p>\n<p><strong>STAGE IV:<\/strong> 22-24.05.2017 \u2013 Renovation of slip road A with a passage from trunk road DK2 from \u015awieco to trunk road DK29 in direction of S\u0142ubice and Zielona G\u00f3ra \u2013 milling, road amendment and pavement layering.<\/p>\n<p><strong>STAGE V:<\/strong> 25-26.05.2017 \u2013 Renovation of slip road C with a passage from trunk road DK29 S\u0142ubice and Zielona G\u00f3ra to trunk road DK2 in direction of \u015awiecko \u2013 milling and roads amendment, passage partially leaded on temporal road.<\/p>\n<p><strong>STAGE VI:<\/strong> 25-28.05.2017 \u2013 Renovation of slip road A with a passage from trunk road DK2 from \u015awieco to trunk road DK29 in direction of S\u0142ubice and Zielona G\u00f3ra, slip road B with a passage from trunk road DK29 from Zielona G\u00f3ra to A2 in direction of Pozna\u0144 and slip road C with a passage from trunk road DK29 S\u0142ubice and Zielona G\u00f3ra to trunk road DK2 in direction of \u015awiecko (passage partially leaded on temporal road) \u2013 reconstruction of road surface markings, works on slip roads conducted separately.<\/p>\n<p><strong>STAGE VII:<\/strong> 29.05-1.06.2017 \u2013 Renovation of slip road C with a passage from trunk road DK29 S\u0142ubice and Zielona G\u00f3ra to trunk road DK2 in direction of \u015awiecko \u2013 pavement layering, passage partially leaded on temporal road.<\/p>\n<p><strong>STAGE VIII:<\/strong> 2.06.2017 \u2013 Renovation of slip road D with a passage from A2 from Pozna\u0144 to trunk road DK29 in direction of S\u0142ubice and Zielona G\u00f3ra \u2013 milling and roads amendment.<\/p>\n<p>Works are conducted within and on \u015awiecko Interchange, at the height of 2,0 to 3,4km of motorway. Renovation is mainly bracing the pavement that covers changes of wearing course and lower layers of construction (where\u2019s needed).<\/p>\n<p>Renovation is guided on schedule, after 6 years from takeover by AWSAII into exploitation from General Directorate for National Roads and Motorways. Another modernization of \u015awiecko Interchange area is planned for 2030.<\/p>\n<p>Works are conducted in double day shift, renovation crop works also on alternate weekends.<\/p>\n<p>The executor of the works is Strabag LLC (person to contact with: Marcin Szczepa\u0144ski, tel. +48 695 020 857). The finalization of works is scheduled for the 8th of June.<\/p>\n<p>The temporal traffic system was agreed with Provincial Police Headquarters in Gorz\u00f3w Wlkp., General Directorate for National Roads and Motorways in Zielona G\u00f3ra, Autostrad\u0105 Wielkopolsk\u0105 Inc, Autostrad\u0105 Eksploatacja Inc, National Road District in S\u0142ubice. German side was informed about renovation of \u015awiecko Interchange by executor of works.<\/p>\n<p>Information about passage condition from Konin to \u015awiecko are available on: twitter.com\/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00a.m. and 8.00 p.m.)<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>On the 15th of May, at 7.00 begins pavement renovation of slip roads on \u015awiecko Interchange, on the crossroad of A2 motorway with trunk road DK29. All works will be conducted in three parts. Pavement renovation of slip roads on \u015awiecko Interchange \u2013 scheduled for 15.05-8.06.2017 Pavement renovation of trunk road DK29 \u2013 scheduled for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":370,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[28,29],"tags":[],"class_list":["post-2628","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2628","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/comments?post=2628"}],"version-history":[{"count":1,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2628\/revisions"}],"predecessor-version":[{"id":2629,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2628\/revisions\/2629"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media\/370"}],"wp:attachment":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media?parent=2628"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/categories?post=2628"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/tags?post=2628"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}