{"id":2624,"date":"2022-07-21T13:41:53","date_gmt":"2022-07-21T13:41:53","guid":{"rendered":"https:\/\/test2.autostrada-a2.pl\/uncategorized\/press-relase-102\/"},"modified":"2022-10-24T09:13:53","modified_gmt":"2022-10-24T09:13:53","slug":"press-relase-102","status":"publish","type":"post","link":"https:\/\/a2.codocaine.com\/en\/news\/press-relase-102\/","title":{"rendered":"Renovation works on Pozna\u0144 Krzesiny Interchange"},"content":{"rendered":"<div>\n<p>On Monday, 13th of June this year begins 6-stage pavement renovation on Pozna\u0144 Krzesiny Interchange, on the crossroad of trunk road S11 with A2 motorway. The works will cause passage difficulties.<\/p>\n<p style=\"text-align: justify;\">The schedule of temporal traffic system:<\/p>\n<p style=\"text-align: justify;\">First part of the renovation will last from 13 to 25th of June and will cover slip roads number 8, 4, 7 and 3 and also a merging lane on A2 with the passage from \u015awiecko to Warszawa.<\/p>\n<p style=\"text-align: justify;\">STAGE I: 15.06. &#8211; Closure of slip road number 8 (passage from trunk road S11 from Katowice to A2 in direction of Warszawa). The detour will be conducted through slip roads number 6, 2, 3.<\/p>\n<p style=\"text-align: justify;\">STAGE II: 15.06.\/16.06. &#8211; Closure of slip road number 4 (passage from A2 from \u015awiecko to trunk road S11 in direction of Katowice). The detour will be conducted through slip roads number 7, 6, 2.<\/p>\n<p style=\"text-align: justify;\">STAGE III: 19.06. \u2013 Closure of slip road number 7 with passage from A2 from \u015awiecko to trunk road S11 in direction of Pozna\u0144 (detour conducted on slip road number 4 through Koninko Interchange) and slip road number 3 with passage from trunk road S11 from Pozna\u0144 to A2 in direction of Warszawa (detour conducted through Koninko Interchange, return on slip road number 8). Additionally there will be a closure of merging lane on A2 from \u015awiecko to Warszawa.<\/p>\n<p style=\"text-align: justify;\">Second part of renovation will start on the 26\/27th of June and last till 10th of July. The works will cover slip roads number 1, 5, 2 and 7 and also a merging lane on A2 with the passage from Warszawa to \u015awiecko.<\/p>\n<p style=\"text-align: justify;\">STAGE IV: 26\/27.06. &#8211; Closure of slip road number 5 (passage from A2 from Warszawa to trunk road S11 in direction of Pozna\u0144). The detour will be conducted through slip roads number 2, 3, 7.<\/p>\n<p style=\"text-align: justify;\">STAGE V: 28\/29.06. &#8211;\u00a0Closure of slip road number 1 (passage from trunk road S11 from Pozna\u0144 to A2 in direction of \u015awiecko). The detour will be conducted through slip roads number 3, 7, 6.<\/p>\n<p style=\"text-align: justify;\">STAGE VI: 1\/2.07. \u2013 Closure of slip road number 2 with passage from A2 from Warszawa to trunk road S11 in direction of Katowice (detour conducted on slip road number 5 through Franowo) and slip road number 6 with passage from trunk road S11 from Katowice to A2 in direction of \u015awiecko (detour conducted through Franowo, return on slip road number 1). Additionally there will be a closure of merging lane on A2 from Warszawa to \u015awiecko.<\/p>\n<p style=\"text-align: justify;\">Works cover changes in binder course and surface course. The executor of the works is Strabag LLC (person to contact: Marcin Szczepa\u0144ski, tel. +48 695 020 857). The finalization of works is scheduled\u00a0till 10th of July.<\/p>\n<p style=\"text-align: justify;\">The temporal traffic system was agreed with Provincial Police Headquarters in Pozna\u0144, City Roads Authority in Pozna\u0144 and General Directorate for National Roads and Motorways, Pozna\u0144 division.<\/p>\n<p style=\"text-align: justify;\">Information about passage condition from Konin to \u015awiecko are available on: twitter.com\/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00a.m. and 8.00 p.m.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>On Monday, 13th of June this year begins 6-stage pavement renovation on Pozna\u0144 Krzesiny Interchange, on the crossroad of trunk road S11 with A2 motorway. The works will cause passage difficulties. The schedule of temporal traffic system: First part of the renovation will last from 13 to 25th of June and will cover slip roads [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":370,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[28,29],"tags":[],"class_list":["post-2624","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2624","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/comments?post=2624"}],"version-history":[{"count":1,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2624\/revisions"}],"predecessor-version":[{"id":2625,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2624\/revisions\/2625"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media\/370"}],"wp:attachment":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media?parent=2624"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/categories?post=2624"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/tags?post=2624"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}