{"id":2616,"date":"2022-07-21T13:41:50","date_gmt":"2022-07-21T13:41:50","guid":{"rendered":"https:\/\/test2.autostrada-a2.pl\/uncategorized\/press-relase-97\/"},"modified":"2022-10-24T09:13:54","modified_gmt":"2022-10-24T09:13:54","slug":"press-relase-97","status":"publish","type":"post","link":"https:\/\/a2.codocaine.com\/en\/news\/press-relase-97\/","title":{"rendered":"Renovation works on Pozna\u0144 Krzesiny Interchange \u2013 II stage"},"content":{"rendered":"<div>\n<p>Overnight, from 28 to 29th of April begins second stage of pavement renovation on eastern roadway of S11 trunk road in direction of Pozna\u0144, which crosses Pozna\u0144 Beltway on Pozna\u0144 Krzesiny Interchange.  The schedule of temporal traffic system.\n<\/p>\n<p>\u2022 There will be a closure of slip road number 6 passage from A2 from \u015awiecko to S11 in direction of Pozna\u0144). The detour will be conducted through Koninko Interchange (access by slip road number 4).<\/p>\n<p>\u2022 Slip road number 5 (passage from S11 from Katowice to A2 in direction of Warszawa) is still closed for passage. The detour is conducted through slip roads number 7, 2, 3.<\/p>\n<p>\u2022 Passage on western roadway of trunk road S11 is organized bidirectionally.<\/p>\n<p>All difficulties connected to second stage of renovation works will last 7 days.<\/p>\n<p>Works cover changes in subgrade and bitumastic layers to brace pavement structure. The executor of the works is Strabag LLC (person to contact: Marcin Szczepa\u0144ski, tel. +48 695 020 857). The finalization of works is scheduled by the end of May this year.<\/p>\n<p>The temporal traffic system was agreed with Provincial Police Headquarters in Pozna\u0144, City Roads Authority in Pozna\u0144 and General Directorate for National Roads and Motorways, Pozna\u0144 division. Information about passage condition from Konin to \u015awiecko are available on: twitter.com\/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00a.m. and 8.00 p.m.)<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Overnight, from 28 to 29th of April begins second stage of pavement renovation on eastern roadway of S11 trunk road in direction of Pozna\u0144, which crosses Pozna\u0144 Beltway on Pozna\u0144 Krzesiny Interchange. The schedule of temporal traffic system. \u2022 There will be a closure of slip road number 6 passage from A2 from \u015awiecko to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":370,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[28,29],"tags":[],"class_list":["post-2616","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2616","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/comments?post=2616"}],"version-history":[{"count":1,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2616\/revisions"}],"predecessor-version":[{"id":3842,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2616\/revisions\/3842"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media\/370"}],"wp:attachment":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media?parent=2616"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/categories?post=2616"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/tags?post=2616"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}