{"id":2542,"date":"2022-07-21T13:41:40","date_gmt":"2022-07-21T13:41:40","guid":{"rendered":"https:\/\/test2.autostrada-a2.pl\/uncategorized\/press-relase-30\/"},"modified":"2022-10-24T09:14:09","modified_gmt":"2022-10-24T09:14:09","slug":"press-relase-30","status":"publish","type":"post","link":"https:\/\/a2.codocaine.com\/en\/news\/press-relase-30\/","title":{"rendered":"Conclusion of the Agreement for the Construction and Operation of A2 Motorway section from Nowy Tomy\u015bl to \u015awiecko (km 105.9)"},"content":{"rendered":"<div>\n<p>On 30 August 2008 the negotiations held since July last year to define business terms for the construction and operation of A2 Motorway from \u015awiecko to Nowy Tomy\u015bl were completed.<\/p>\n<p>\n\tOn 30 August 2008 the negotiations held since July last year to define business terms for the construction and operation of A2 Motorway from \u015awiecko to Nowy Tomy\u015bl were completed.<\/p>\n<p>\n\tThe Agreement for the construction and operation of the motorway was signed by Cezary Grabarczyk, the Minister of Infrastructure, and the representatives of Autostrada Wielkopolska S.A. (AWSA), the Concession Company, at the Ministry.<br \/>\n\tThe Financial Close involving the final acceptance by the financing institutions crediting the project is planned to be achieved at the beginning of the year 2009. This shall be the project\u2019s financial basis and enable the construction to commence. The time schedule adopted by both parties provides for commencing the construction in March 2009 and opening the motorway for traffic at the end of 2011. Strabag Austria shall be the general contractor for the project.<br \/>\n\tThe A2 section to \u015awiecko shall be the first ever motorway section of that length built using the concrete technology. The Agreement signed with the Government defined the costs of construction of the Western part of the A2 motorway at EUR 1 milliard 298 million, that is EUR 12.2 million per kilometer. The cost of the construction of Nowy Tomy\u015bl-\u015awiecko is comprehensive and includes the costs of the construction design and all preparatory works to be performed by the Company before commencing the construction. Moreover; the cost of complete motorway equipment is taken into account, including, without limitation Toll Plazas, Emergency Systems, Rest and Service Areas, totaling EUR 1.5 million per kilometer. The projects implemented by other entities do not cover such necessary infrastructure.<\/p>\n<p>\n\tThe scope of the project includes:<\/p>\n<ul>\n<li>\n\t\t105.9 km of the new motorway with concrete pavement, including 18.8 km of the existing national road no 2 to be upgraded<\/li>\n<li>\n\t\t76 bridges and flyovers \u2013 86 as a target<\/li>\n<li>\n\t\t2 Motorway Maintenance Centres (Ilanka, Bia\u0142y Mur)<\/li>\n<li>\n\t\t6 complete motorway interchanges \u2013 8 as a target (Nowy Tomy\u015bl, Trzciel, Jordanowo, Torzym, Rzepin, \u015awiecko)<\/li>\n<li>\n\t\t6 Rest and Service Areas &#8211; 10 as a target (Rogoziniec, Chociszewo, Koryta, Walewice, Sosna, Gnilec) equipped with parking lots, toilets, children\u2019s playgrounds, and 4 bars and 4 petrol stations<\/li>\n<li>\n\t\tclosed toll collection system i.e. 5 Toll Plazas and Stations ( 1 mainline Toll Plaza in Tarnawa, 4 Toll Stations in the motorway interchanges: Nowy Tomy\u015bl, Trzciel, Jordanowo, Torzym)<\/li>\n<li>\n\t\tcomplete environmental protection equipment (environmental ponds, noise barriers, isolating green, animal passes, security equipment \u2013 emergency call boxes every 2 km, fencing along the whole motorway (except for interchanges)<\/li>\n<\/ul>\n<p>\n\tOwing to the construction of A2 Motorway from Nowy Tomy\u015bl to the German border, in 2011 Poland shall be included in the European motorway network.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>On 30 August 2008 the negotiations held since July last year to define business terms for the construction and operation of A2 Motorway from \u015awiecko to Nowy Tomy\u015bl were completed. On 30 August 2008 the negotiations held since July last year to define business terms for the construction and operation of A2 Motorway from \u015awiecko [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":370,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[28,29],"tags":[],"class_list":["post-2542","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-press-relases"],"acf":[],"_links":{"self":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2542","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/comments?post=2542"}],"version-history":[{"count":1,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2542\/revisions"}],"predecessor-version":[{"id":3919,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/posts\/2542\/revisions\/3919"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media\/370"}],"wp:attachment":[{"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/media?parent=2542"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/categories?post=2542"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a2.codocaine.com\/en\/wp-json\/wp\/v2\/tags?post=2542"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}