Road resurfacing at the Poznań Komorniki junction
On 27 July 2026, Autostrada Wielkopolska SA will commence road resurfacing works at the Poznań Komorniki junction (159 km A2).…
Read more
home
A2 Świecko - Konin | Every kilometer matters
The works will consist, without limitation, in upgrading the lighting, and the luminaires used so far will be replaced with more ecological LED ones. The roofing of the canopy at the Lądek Toll Plaza will also be upgraded. This involves the temporary closure of individual traffic lanes for 5-10 days, depending on the scope of work in a given place.
In order to minimize the nuisance caused by the rehabilitation to drivers, the works were divided into stages in such a way as to exclude from use a maximum of two out of 14 available lanes at a time. During the rehabilitation there may also be difficulties in the movement of oversize vehicles, yet they will be able to pass.
Initially, the rehabilitation of the canopy at the Lądek TP, once started, is planned to last about 2.5 months. Autostrada Wielkopolska obliged the contractor to deliver on time. However, please note that difficult weather conditions may affect the time of performing the works.