back home A2 Świecko - Konin | Every kilometer matters
Back

Continuation of works. Pavement renovation of A2 on section Poznań – Września

From May the works related to wearing course exchange on section Poznań-Września will be continuate. Temporary traffic system will be introduced on indicated sections of motorway.

Schedule of works:
• 16-30.05 closure of northern road, southern road-lanes drive on section 205km+950 – 202km+350. Closure of emergency exit (203km+775), northern side
• 22.05 closure of northern road, southern road-lanes drive on section 202km+350 – 199km+850; closure of CSA Chwałszyce
• 4.06 closure of northern road, southern road-lanes drive on section 199km+850 – 196km+950. Closure of emergency exit (197km+035), northern side

Schedule presented above can change, due to weather conditions.

Information about traffic flow from Konin to Świecko is available on: twitter.com/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00 a.m. and 8.00 p.m.)