back home A2 Świecko - Konin | Every kilometer matters
Back

Next stage of pavement renovation of A2 on section Poznań – Września

The next stage of the works related to wearing course exchange on section Poznań-Września starts (171km+600-193km+950). Temporary traffic system will be introduced on indicated sections of motorway.

Schedule of works:
• 27.06-5/6.07 closure of northern road, southern road-lanes drive on section 193km+950 – 190km+150
• 29/30.06 section 196km+950 do 193km+950 of northern road reintroduced for passage
• 29/30.06 closure of northern road, southern road-lanes drive on section 190km+150- 186km+900. Closure of emergency exit (186km+895). Estimated time of work: 10-12 working days

Schedule presented above can change, due to weather conditions.

Information about traffic flow from Konin to Świecko is available on: twitter.com/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00 a.m. and 8.00 p.m.)