Road resurfacing at the Poznań Komorniki junction
On 27 July 2026, Autostrada Wielkopolska SA will commence road resurfacing works at the Poznań Komorniki junction (159 km A2).…
Read more
home
A2 Świecko - Konin | Every kilometer matters
Between May 16 – 22 the pavement renovation of the road viaduct situated above A2 motorway (Sługocin Interchange, 243 km+671) on regional road DW467 is planned.
Temporary traffic system will be introduced for that period.
The works will result in temporary occupation of a portion of a road for the whole length of the viaduct.
The planned date of work can change mainly due to weather conditions.
The temporary traffic system was agreed with General Directorate for National Roads and Motorways.
Information about traffic flow from Konin to Świecko is available on: twitter.com/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00 a.m. and 8.00 p.m.)