Road resurfacing at the Poznań Komorniki junction
On 27 July 2026, Autostrada Wielkopolska SA will commence road resurfacing works at the Poznań Komorniki junction (159 km A2).…
Read more
home
A2 Świecko - Konin | Every kilometer matters
On Monday 10th of July at 6.00 starts pavement renovation of main road A2 motorway on section Września-Konin. First part of works is scheduled for the length from232km+300 to 236km+200 in direction of Warszawa. Southern roadway in direction of Warszawa will be closed for passage. There will be temporal traffic system.
Passage in direction of Warszawa will be transferred to one lane of northern roadway (direction Świecko).
Sections of renovated road will be changed successively, depending on works progress.
Works will be conducted according to heavy maintenance plan, that assumes (same as in case of public motorways) pavement renovation after 10 years of using.
Works will last till October 2017.
The executor of the works is Strabag LLC (person to contact with: Marcin Szczepański, tel. +48 695 020 857).
The temporal traffic system was agreed with Provincial Police Headquarters in Poznań, General Directorate for National Roads and Motorways, Autostrada Wielkopolska Inc and Autostrada Eksploatacja Inc.
Information about passage condition from Konin to Świecko are available on: twitter.com/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00a.m. and 8.00 p.m.)