Road resurfacing at the Poznań Komorniki junction
On 27 July 2026, Autostrada Wielkopolska SA will commence road resurfacing works at the Poznań Komorniki junction (159 km A2).…
Read more
home
A2 Świecko - Konin | Every kilometer matters
Modernization of ORLEN petrol station within A2 motorway:
• 5km, direction Warszawa, CSA Sosna – execution of works, scheduled finalization of works: 16.12.2016
• 251km, direction Warszawa, CSA Osiecza – scheduled execution time: 2.11-16.12.2016
• 251km, direction Świecko, CSA Osiecza – scheduled execution time: 2.11-16.12.2016
Fueling is possible at all mentioned points. Works on other petrol stations are scheduled after 8.01.2017.
Information about passage condition from Konin to Świecko are available on: twitter.com/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00 a.m. and 8.00 p.m.)