back home A2 Świecko - Konin | Every kilometer matters
Back

Modernization of ORLEN petrol station

Modernization of ORLEN petrol station within A2 motorway:

• 5km, direction Warszawa, CSA Sosna – execution of works, scheduled finalization of works: 16.12.2016
• 251km, direction Warszawa, CSA Osiecza – scheduled execution time: 2.11-16.12.2016
• 251km, direction Świecko, CSA Osiecza – scheduled execution time: 2.11-16.12.2016

Fueling is possible at all mentioned points. Works on other petrol stations are scheduled after 8.01.2017.

Information about passage condition from Konin to Świecko are available on: twitter.com/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00 a.m. and 8.00 p.m.)