Road resurfacing at the Poznań Komorniki junction
On 27 July 2026, Autostrada Wielkopolska SA will commence road resurfacing works at the Poznań Komorniki junction (159 km A2).…
Read more
home
A2 Świecko - Konin | Every kilometer matters
Continuation of ORLEN petrol stations modernization within A2 motorway. Works on CSA Osiecza II, Osiecza III and Sosna are finished. Schedule of next stages of works.
Scope of works: modernization of stations pavilion due to gastronomic offer extension within existing venues. Both buildings will be out of use and so will be the toilets.
Petrol sales will be executed on two stands in temporary containers on both CSA’s.
Works on other objects (CSA Krzyżowniki and Sędzinko) are scheduled after the finalization of works on CSA Zalesie and Tulce.
Information about passage condition from Konin to Świecko are available on: twitter.com/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00 a.m. and 8.00 p.m.)