back home A2 Świecko - Konin | Every kilometer matters
Back

Modernization of ORLEN petrol stations within A2 – CSA Tulce and Zalesie

Continuation of ORLEN petrol stations modernization within A2 motorway. Works on CSA Osiecza II, Osiecza III and Sosna are finished. Schedule of next stages of works.

  • 134km, direction Warszawa, CSA Zalesie – works execution time: 23.01-6.03.2017.
  • 177km, direction Świecko, CSA Tulce – works execution time: 30.01-13.03.2017.

Scope of works: modernization of stations pavilion due to gastronomic offer extension within existing venues. Both buildings will be out of use and so will be the toilets.

Petrol sales will be executed on two stands in temporary containers on both CSA’s.

Works on other objects (CSA Krzyżowniki and Sędzinko) are scheduled after the finalization of works on CSA Zalesie and Tulce.

Information about passage condition from Konin to Świecko are available on: twitter.com/AutostradaWlkp and on Hotline number +48 504 422 022 (everyday between 8.00 a.m. and 8.00 p.m.)